Overview
This review verifies the test readiness for "SDIACT-129 Incremental GridFTP fixes and enhancements that address the logjam vulnerability" and will be conducted jointly with SD&I and Operations. GridFTP is an extension of the standard File Transfer Protocol (FTP) for high-speed, reliable, and secure data transfer. This activity is provides the recent patched GridFTP 6.x server that addresses the logjam vulnerability.
Review Input Documents
Software
- Binary Tar Gzs
- For RPM/Yum, please see XSEDE-GridFTP-install.html for Yum installation instructions
Documentation
- Introduction
- Installation guide
- XSEDE-GridFTP-install.html
- Please see instructions from the install guide that specify the development repository "NOTE: If you need an SD&I Development version, you will need to configure your system to use the XSEDE-Development repository by following this procedure https://software.xsede.org/development/repo/repoconfig.txt"
- User guide
- Defect, issue, and risk reporting
- See Test Plan and XSEDE-GridFTP-install.html
- Acceptance test plan
- Testing resources
- hpcdev-pub04.sdsc.edu (Peter - Yum)
- TBD machine at PSC (Bryon - binary targz)
Review Criteria
Package information: All software packages (e.g., server and client
packages) for this CI are listed.
Documentation and Installation instructions: The deployment plan for this
CI on XSEDE is clearly described as well as the installation instructions and
any XSEDE specific configuration instructions.
Test environment and facilities: The test environment needed to
adequately to validate this component is described. Should indicate also
whether testing can be performed within a VM and if not, the reasons for it.
Assumptions: Lists any assumptions needed before testing can begin (e.g.,
accounts needed).
Test procedures, cases, and scenarios: Lists the tests that should be run
or an associated test suite and expected performance metrics if applicable.
Defect, issue, and risk reporting: Deployment plans should include defect
and issue reporting information. The testing plan could reference that same
information from the deployment plan, or provide alternate information if
defects and issues need to be reported differently during testing. Risks, as
well as defects and issues, should be part of the testing report.
Schedule
Current Date: 2025-02-15Current Status: Closed (Joint SD&I and Operations Readiness Review)
Target Date | Actual Date | Activity Milestone |
---|---|---|
2015-09-11 | Review launch date | |
2015-09-17 | 2015-09-22 | Written feedback due (Reviewers) |
2015-09-21 | 2015-09-22 | Written response date (Review Material Developers) |
2015-09-22 | 2015-09-22 | Final approval due and completion date (Reviewers) |
Review Last Updated: 2015-09-22 7:53 am
Reviewers
If you are a reviewer, please login to sign or withdraw from this review.
Required
- Peter Enstrom
SIGNED: 2015-09-22 10:48 - Bryon Gill
SIGNED: 2015-09-17 15:20 - Shava Smallen
SIGNED: 2015-09-18 10:13
Optional
- Maytal Dahan
Review Material Developers
Eric Blau
Review Facilitator
Shava Smallen